Categories
- Bar Stool
- Bed-Side Drawer
- Benches
- Boardroom Tables
- bookcase
- Clerical Desking
- coat hangers
- Coffee Table
- Conference Chair
- Dining Sets
- Dining Tables
- Dressers
- Fireproof Safes
- Foldable Chairs
- Foldable Tables
- Gaming Chairs
- Hammock
- High Back Office Chairs
- Home Chair
- Home Furniture
- Kids' Desk & Chair
- Kids' Furniture
- Locker Cabinets
- Mid Back Office Chairs
- Office Benches
- Office Cabinets
- Office Chair
- Office Desk
- Office Furniture
- Office Safe
- Office Sofa Sets
- Office Tables
- Office Workstations
- Plastic Chairs
- Reception Desk
- Rocking Chairs
- Standing Desk
- storage cabinets
- Storage Units
- Study Desks
- Workstations
Products
-
Executive Leather Director's Chair
KSh 35,500.00Original price was: KSh 35,500.00.KSh 33,500.00Current price is: KSh 33,500.00. -
1.8m Executive Advanced Office Table
KSh 68,000.00Original price was: KSh 68,000.00.KSh 58,000.00Current price is: KSh 58,000.00. -
Orthopedic Mesh Seat With Footrest
KSh 38,500.00Original price was: KSh 38,500.00.KSh 34,500.00Current price is: KSh 34,500.00. -
5-Tier Modern Wooden Bookshelf
KSh 23,500.00Original price was: KSh 23,500.00.KSh 18,500.00Current price is: KSh 18,500.00. -
3-Seat Office Waiting Bench
KSh 32,500.00Original price was: KSh 32,500.00.KSh 28,500.00Current price is: KSh 28,500.00. -
1.8 Meters L-Shaped Office Desk
KSh 68,000.00Original price was: KSh 68,000.00.KSh 58,000.00Current price is: KSh 58,000.00. -
Ergonomic Home Office Chair
KSh 23,500.00Original price was: KSh 23,500.00.KSh 18,500.00Current price is: KSh 18,500.00. -
4-Door Steel Office Cabinet
KSh 32,500.00Original price was: KSh 32,500.00.KSh 28,500.00Current price is: KSh 28,500.00. -
Office Executive Seat With Footrest
KSh 68,500.00Original price was: KSh 68,500.00.KSh 48,500.00Current price is: KSh 48,500.00. -
10-Seater Office Conference Table
KSh 58,000.00Original price was: KSh 58,000.00.KSh 48,500.00Current price is: KSh 48,500.00.
Office Workstations

Products
-
Executive Leather Director's Chair
KSh 35,500.00Original price was: KSh 35,500.00.KSh 33,500.00Current price is: KSh 33,500.00. -
1.8m Executive Advanced Office Table
KSh 68,000.00Original price was: KSh 68,000.00.KSh 58,000.00Current price is: KSh 58,000.00. -
Orthopedic Mesh Seat With Footrest
KSh 38,500.00Original price was: KSh 38,500.00.KSh 34,500.00Current price is: KSh 34,500.00. -
5-Tier Modern Wooden Bookshelf
KSh 23,500.00Original price was: KSh 23,500.00.KSh 18,500.00Current price is: KSh 18,500.00. -
3-Seat Office Waiting Bench
KSh 32,500.00Original price was: KSh 32,500.00.KSh 28,500.00Current price is: KSh 28,500.00.
Ergonomic Strong Mesh Office Chair
KSh 10,500.00 Original price was: KSh 10,500.00.KSh 8,500.00Current price is: KSh 8,500.00.
Experience exceptional support and breathability with the Ergonomic Strong Mesh Office Chair. Designed for professionals who demand comfort and resilience, this chair features a robust frame, breathable mesh back, and adjustable ergonomics to keep you productive and comfortable throughout your day.
⭐ Key Features:
-
Durable Steel Frame: Built to support heavy use while maintaining stability and strength.
-
Breathable Mesh Back: Promotes airflow to keep you cool and comfortable during extended sitting.
-
Ergonomic Support: Adjustable lumbar support and contoured backrest reduce strain and improve posture.
-
Adjustable Seat Height: Pneumatic lift allows easy customization to fit your desk and body.
-
Comfortable Padding: High-density foam seat cushion with waterfall edge for reduced leg pressure.
-
Smooth Rolling Casters: Glide effortlessly on carpet or hard floors for mobility.
-
360° Swivel: Full rotation for easy multitasking and movement.
Ergonomic Strong Mesh Office Chair – Comfort Meets Durability
Experience superior comfort and lasting support with our Ergonomic Strong Mesh Office Chair, designed to enhance your productivity while protecting your posture. Whether you’re working long hours at the office or setting up your home workspace, this chair offers the perfect blend of durability, breathability, and ergonomic design.
Breathable Mesh for All-Day Comfort
The chair’s high-quality strong mesh backrest allows for excellent airflow, keeping you cool and comfortable even during extended sitting sessions. Unlike traditional padded chairs, this breathable design prevents heat buildup and reduces sweating, ensuring you stay fresh throughout your workday.
Ergonomic Support to Reduce Fatigue
Designed with your health in mind, this office chair features an ergonomic contoured backrest that supports the natural curve of your spine. The adjustable lumbar support helps reduce lower back strain, promoting better posture and minimizing discomfort. Additionally, the padded seat cushion offers firm, comfortable support, helping you stay focused without pain or fatigue.
Adjustable and Mobile for Maximum Flexibility
Equipped with a 360-degree swivel base and smooth-rolling caster wheels, this chair moves effortlessly across most floor types. You can also adjust the seat height and tilt tension to find your ideal seating position. The sturdy armrests provide additional comfort while typing or during breaks.
Durable Build for Long-Term Use
Constructed from robust materials, including reinforced mesh fabric and a strong metal frame, this chair is built to withstand daily use in busy offices or home environments. Its sleek, modern design fits seamlessly into any workspace, adding a professional touch to your office décor.
Key Features:
-
Strong breathable mesh backrest
-
Ergonomic lumbar support and contoured design
-
Adjustable seat height and tilt tension
-
360° swivel with smooth caster wheels
-
Durable metal frame and armrests
-
Stylish design suitable for any office environment
Keywords Targeted:
ergonomic strong mesh office chair, breathable office chair, adjustable mesh desk chair, ergonomic swivel chair, durable office chair
You may also like…
-
Dressers
Bedroom Vanity Dressing Table
KSh 38,500.00Original price was: KSh 38,500.00.KSh 32,500.00Current price is: KSh 32,500.00.Add to cartAdd elegance, storage, and functionality to your bedroom or dressing area with our curated collection of dressers — available in a range of styles, finishes, and configurations to suit every space and décor. Whether you’re looking for a sleek modern dresser, a rustic wooden piece, or a timeless classic with detailed craftsmanship, our selection offers the perfect balance of form and function. Designed for everyday convenience, each dresser provides spacious drawers for organizing clothes, accessories, linens, and more, while enhancing the overall aesthetic of your room.
Key Features & Highlights
🪵 Premium Materials
-
Constructed from solid wood, engineered wood, or laminated MDF
-
Available in elegant finishes: walnut, oak, espresso, white, black, and more
-
Optional glass tops, metal accents, or mirrored fronts for added style
🗄️ Functional Storage Design
-
Available in 3-drawer, 6-drawer, 8-drawer, and wide dresser formats
-
Smooth-glide tracks for easy opening and closing
-
Deep drawers ideal for organizing clothing, bedding, or personal items
🎨 Versatile Aesthetic Options
-
Styles ranging from modern, Scandinavian, and mid-century, to classic wooden dressers
-
Matching nightstands, mirrors, and wardrobes available for a cohesive look
-
Decorative knobs, minimalist handles, or push-to-open drawers for clean lines
📐 Size & Fit
-
Compact models for small spaces or apartments
-
Full-size dressers ideal for master bedrooms or large closets
-
Custom sizing available for select models
🛠️ Easy Setup & Care
-
Shipped pre-assembled or with simple assembly instructions
-
Durable finishes resist daily wear, spills, and scratches
-
Easy to clean with a dry or damp cloth
🏡 Ideal For
-
Bedrooms, walk-in closets, guest rooms, and dressing areas
-
Also suitable for entryways, hallways, or multi-purpose storage
-
-
Dressers
Glam Mirrored Vanity Dresser
KSh 20,500.00Original price was: KSh 20,500.00.KSh 14,500.00Current price is: KSh 14,500.00.Add to cartAdd a touch of luxury to your beauty routine with our Glam Mirrored Vanity Dresser. Designed to reflect elegance and style, this stunning piece features a full mirrored finish, crystal knobs, and spacious storage — making it the perfect centerpiece for any modern bedroom or dressing area.
Key Features:
-
Elegant Mirrored Finish – Reflective surfaces create a bright, glamorous aesthetic
-
Spacious Storage Drawers – Multiple drawers provide ample space for cosmetics, accessories, and beauty essentials
-
Crystal Drawer Knobs – Adds a sophisticated sparkle and easy grip
-
Durable Construction – Made with high-quality materials for lasting style and function
-
Versatile Design – Complements glam, modern, or Hollywood Regency interiors
-
Easy to Clean – Smooth glass surfaces make maintenance effortless
-
Optional Matching Stool & Mirror – Complete the look with coordinating accessories (sold separately)
-
-
Bar Stool
Tall Upholstered Bar Stool
KSh 18,500.00Original price was: KSh 18,500.00.KSh 12,500.00Current price is: KSh 12,500.00.Add to cartAdd style and comfort to your bar or kitchen counter with this Tall Upholstered Bar Stool. Featuring a plush cushioned seat and sleek design, this stool combines elegance and functionality, making it perfect for casual seating in both home and commercial spaces.
Key Features
-
Comfortable Upholstery: Soft padded seat with high-quality fabric or leather options for lasting comfort.
-
Tall Seat Height: Ideal for bar counters and high tables, offering optimal seating posture.
-
Sturdy Frame: Built with durable metal or wood for stability and strength.
-
Footrest Support: Integrated footrest enhances comfort during extended seating.
-
Modern Design: Clean lines and versatile style that complements various interior decors.
-
Easy to Clean: Upholstery materials are resistant to spills and stains for hassle-free maintenance.
-
Lightweight & Portable: Easy to move for flexible seating arrangements.
-
-
Bar Stool
Ceramic Kitchen Bar Stool
KSh 12,500.00Original price was: KSh 12,500.00.KSh 9,500.00Current price is: KSh 9,500.00.Add to cartElevate your kitchen seating with our stylish Ceramic Kitchen Bar Stool. Featuring a smooth, durable ceramic seat paired with a sturdy metal frame, this bar stool combines modern design with lasting comfort. Perfect for kitchen islands, breakfast bars, or casual dining spaces, it adds a touch of elegance while providing reliable support. Easy to clean and maintain, it’s the ideal blend of form and function for any contemporary home.
Key Features:
-
Elegant Ceramic Seat: Smooth, glossy ceramic surface that’s easy to clean and resistant to stains.
-
Sturdy Metal Frame: Provides strong support and long-lasting stability.
-
Comfortable Design: Ergonomically shaped seat for comfortable seating during meals or gatherings.
-
Contemporary Style: Sleek, minimalist look that complements modern kitchen décor.
-
Durable Construction: Built to withstand everyday use in busy kitchen environments.
-
Non-Slip Feet: Protects your floors while keeping the stool securely in place.
-
Versatile Use: Perfect for kitchen islands, bars, counters, and breakfast nooks.
-
Notice: fwrite(): Write of 131 bytes failed with errno=122 Disk quota exceeded in /home/eekyywof/public_html/wp-content/plugins/woocommerce/src/Internal/Admin/Logging/FileV2/File.php on line 456
Related products
-
Mid Back Office Chairs
Office Chair with Writing Surface
KSh 15,500.00Original price was: KSh 15,500.00.KSh 12,500.00Current price is: KSh 12,500.00.Add to cartUpgrade your workspace with our ergonomic Office Chair with Writing Surface — the perfect blend of comfort and functionality. Designed for students, professionals, and conference rooms, this chair features a sturdy writing tablet ideal for note-taking, laptops, or meetings. Its sleek design and adjustable elements promote productivity and comfort during long hours of use. Ideal for classrooms, training rooms, and home offices.
Key Features:
-
Ergonomic Design: Provides lumbar support and comfort for extended sitting periods
-
Integrated Writing Surface: Durable and spacious tablet for writing, laptops, or tablets
-
360° Swivel & Mobility: Smooth-rolling casters for easy movement and flexibility
-
Adjustable Height: Customize chair height for optimal comfort and posture
-
Sturdy Frame: Built with high-quality materials to ensure long-lasting durability
-
Compact & Space-Saving: Ideal for classrooms, offices, and meeting rooms
-
Easy Assembly: Simple setup with clear instructions included
-
-
Mid Back Office Chairs
Strong Mesh Office Chair
KSh 10,500.00Original price was: KSh 10,500.00.KSh 8,500.00Current price is: KSh 8,500.00.Add to cartExperience all-day comfort and support with the Strong Mesh Office Chair — expertly designed for durability, breathability, and ergonomic performance. Its reinforced mesh back ensures optimal airflow and lumbar support, making it ideal for long working hours in any modern office setting. Built tough, this chair delivers the perfect balance of strength, style, and comfort.
Key Features:
-
Reinforced Mesh Back: Promotes airflow and prevents heat buildup during extended use
-
Ergonomic Support: Adjustable lumbar support to maintain proper posture and reduce fatigue
-
High Load Capacity: Heavy-duty frame designed for long-term use and enhanced durability
-
Comfortable Seat Cushion: Padded seat with high-density foam for superior comfort
-
Adjustable Armrests: Customize arm position for better alignment and reduced strain
-
360° Swivel & Smooth Casters: Easy movement and access to your workspace
-
Height Adjustable: Pneumatic lift allows effortless seat height customization
-
Sleek Design: Minimalist style that suits any professional office or home workspace
-
-
Mid Back Office Chairs
Clerical Mesh Office Chair
KSh 8,500.00Original price was: KSh 8,500.00.KSh 6,500.00Current price is: KSh 6,500.00.Add to cartEnhance your workspace with the Clerical Mesh Swivel Office Chair, designed for ergonomic support and breathability during long work hours. Featuring a breathable mesh backrest and smooth swivel action, this chair promotes comfort and flexibility. Its adjustable height and sturdy base make it a perfect addition to any office or home desk setup, ensuring productivity and style in one sleek package.
Key Features
-
Breathable Mesh Back: Promotes airflow to keep you cool and comfortable
-
360° Swivel Function: Easy movement and access without standing up
-
Adjustable Height: Customize seat height for optimal ergonomic support
-
Sturdy Base: Durable construction with smooth-rolling casters for mobility
-
Ergonomic Design: Supports proper posture during extended periods of sitting
-
Compact and Lightweight: Ideal for clerical work, home offices, and small spaces
-
Easy Assembly: Quick setup with included instructions and tools
-
-
Mid Back Office Chairs
Conference Room Office Chair
KSh 12,500.00Original price was: KSh 12,500.00.KSh 8,500.00Current price is: KSh 8,500.00.Add to cartAdd comfort and style to your meeting space with this modern Conference Room Office Chair, designed to support productivity and professionalism in any boardroom, meeting area, or executive suite. Built with ergonomic features and a sleek aesthetic, this chair ensures that attendees stay comfortable through long sessions. Its streamlined design, supportive cushioning, and durable construction make it a reliable choice for high-traffic office environments. Whether you’re hosting daily meetings or high-level presentations, this chair combines form and function to enhance your conference experience.
Key Features
Ergonomic Design for Long Meetings
Contoured backrest and cushioned seat support natural posture and reduce fatigue during extended discussions or presentations.
Premium Upholstery
Available in leatherette, fabric, or mesh options for a professional finish that suits modern or traditional office décor.
Fixed or Padded Armrests
Comfortable armrests provide additional support and help maintain proper sitting posture throughout the meeting.
Sturdy Base with Smooth Casters
Equipped with a durable metal or nylon base and smooth-rolling wheels for easy movement across carpet or hard flooring.
Swivel Function & Tilt Mechanism
360° swivel and tilt-lock features (model-dependent) allow for greater flexibility and relaxation when needed.
Sleek & Professional Appearance
Minimalist design with clean lines fits seamlessly into boardrooms, training rooms, or executive offices.
Low Maintenance & Easy Cleaning
Durable materials are easy to wipe clean, ensuring your conference room always looks presentable.
Available in Multiple Colors
Choose from classic black, gray, or neutral tones to match your office branding or interior style.















Reviews
There are no reviews yet.